Nursing home construction sequencing – Southeast Asia

Nursing home construction sequencing – Southeast Asia

Although only required to develop 4th-Dimensional construction sequencing, this gentle project was demanding expertise in project management.

Overview

Existing BIM models for Architecture and Structure were to be reused followed by site development.

4D construction sequencing was to be done for day to day basis as the actual construction of G+6 was to be completed within three months.

The Challenge

The main challenge was the time frame versus the amount of work to be done prior construction within a month’s time.

Our approach/services

Prior to start the 4D construction sequencing, we had to model the actual site. Our expertise for infrastructure design was then used to develop the existing topography using satellite(s) digital elevation data and site development was done with thorough client input(s).

The 4D construction sequencing was itself a demanding project as we were going to sequence day to day tasks within a limited timeframe and also the optimization was to be done to finish on schedule.

The targets were achieved within the timeframe provided.

Outcome

A fine 4D construction simulation and a real-time topographic BIM model.

Completion date: November 2016

Summary
Nursing home construction sequencing – Southeast Asia
Article Name
Nursing home construction sequencing – Southeast Asia
Description
Existing BIM models for Architecture and Structure were to be reused followed by site development. 4D construction sequencing was to be done for day to day basis as the actual construction of G+6 was to be completed within three months.