Punggol HDB, South East Asia

Punggol HDB, South East Asia

Tightly programmed projects are becoming our specialty now-a-days and this luxurious housing project was tough to deal.

Overview

We were provided with the CAD drawings from principal architect’s studio and engineering consultants and we were required to create BIM models for Architecture, Structure and MEP for submission with the government.

The models that we were about to create, comprises of 10 nos. of 22 stories high rise towers with 02 nos. of multi storey car parks along with site development in LOD 300 detail segment.

The project dead line was for 02 months.

The Challenge

The main challenge was to plan and execute the project in such a short time span.

PUNGGOL HDB WDI STUDIOS BIM SERVICES

Our approach/services

It was the time when modelling team had worked in shifts and in expert collaboration to pull the job. Their efficiency and coordination had made us feel proud again by meeting the extreme tight work schedule.

Outcome

A fully co-ordinated, LOD 300 BIM (Building Information Model) model for 10 high rise towers and 2 MSCPs and an extremely short project timeframe of two months made delivering on this fast-track project challenging.

Completion date: January 2017

Summary
Punggol HDB, South East Asia
Article Name
Punggol HDB, South East Asia
Description
We were provided with the CAD drawings from principal architect’s studio and engineering consultants and we were required to create BIM models for Architecture, Structure and MEP for submission with the government.