Why SOLIDWORKS is best for Solid 3D Modelling?

Why SOLIDWORKS is best for Solid 3D Modelling?

SOLIDWORKS is a parametric based 3D modelling CAD software and is been adapted by more than 1,50,000 companies worldwide. Apart from dominating manufacturing sector, This 3D Modelling software also been used in interior, architectural and medicine industries to name a few.

SOLIDWORKS provides a wide platform for solid modelling, as well as for surface modelling both controlled parametrically. Parametric 3d modelling is a modelling technique in which geometries are controlled by using numeric parameters like diameter of a circle and geometry based parameters like concentricity and perpendicularity. Hence one can capture design intent to change the product’s geometry and shape throughout the product development process.

Apart from 3D modelling SOLIDWORKS do also features Assembly and Drafting module. Assembly module helps engineers, professionals and non-professionals in analyzing and studying behavior of mechanism in a product like motion of components with respect to other components. Assembly module also aids in analyzing interference’s in assembly.
By using drafting features you are ready for the final step for your product. Preparing manufacturing ready drawings using drafting tools in SOLIDWORKS is a fun. Simplicity of U.I of SOLIDWORKS makes its users addicted to this CAD package.

Here are the Top Advantages of Using SOLIDWORKS,

• User friendly Interface making it easier to learn as compared to other CAD software.

• Easy to manipulate design at any stage in the product development phase.

• Real view graphics allow model to be visualize rendered view in real time.

• Integrated add-ons helps in analyzing dynamics, kinematics etc.

• This 3D Modelling software minimizes the time and development cost and allows you to make the design process effortless.

 

Author : Mr Jitendra Gahlot (CAD Design Head)

Hiring a BIM Agency in India : Costs and Benefits

Hiring a BIM Agency in India : Costs and Benefits

Introduction

Like many other countries construction in India is booming to keep pace with the growing need for both urban development and new infrastructures. At the same time technology is moving quickly to assist with these complicated developments with a key player emerging as Building Information Modelling (BIM).  This article looks at the benefits of hiring a BIM agency in India and what this could cost to help construction companies consider whether this is the right option for their project.

What benefits are there to using BIM?

#bimncad

In a nutshell, BIM is assisting the AECO industry to reduce delays and costly overruns, implementation of more advanced 5D BIM also can avoid potential litigation. A 3D digital model of the planned construction is produced to allow design issues to be resolved before building even starts; more data can be analysed alongside the model to include scheduling and cost information thus avoiding costly delays dues to clashes as well as expensive reworking, this is 4D BIM. For a complete visualisation of the project, 5D BIM considers cost, schedule and spatial design for the entirety of the project from conception to demolition to everyone involved in the project. Management of ongoing versus target costing particularly helps avoid potential litigation.

Does my project need a BIM agency?

The design stage any project can cost between 5 – 20% of the total budget, but caution should be erred when deciding whether to cut cost in this area, a lower design spend could lead to problems later and incur unexpected construction costs.

Consider also overall savings in this example:

20% of a $200,000 project is to be spent on design or $40,000 seeking a 5% reduction in this saves $2000 but when we think about the larger construction cost of $180,000 of total budget gaining a 5% reduction here would save a huge $9000. Consider whether this is achievable if you have a more robust design.

What varies the cost of BIM agency input?

Some projects require the use of a civil engineer particularly if they are subject to governmental or other regulations. India is no exception in the last ten years the need for qualified civil engineers has grown with the need for construction. Ensure that a civil engineer is used should this is mandatory but consider it for all complicated projects.  It is increasingly likely that a civil engineer will recommend the use of BIM technology due to its significant benefits and potential cost saving.

Various factors will affect the cost of BIM agency involvement such as the level of detail (3D, 4D or 5D) you desire or the project demands.  Focusing on the project generally the larger the project, the higher the cost but note that more complicated or special projects such as sewage works or dams will have a higher cost regardless of size.  The nature of the workforce may also impact cost. Obviously, a larger workforce takes a larger scale of the organisation to ensure scheduling is fit for purpose. But the involvement of numerous contractors such as electrical, water, gas services, plumbing all need coordination, a greater number of contractors may also increase cost.

The experience of the BIM agency is important as is their understanding of local regulations (which vary both from country to country but also in different states). Obviously, more experienced agencies may command a higher fee, but this must be balanced with potential savings this type of knowledge could gain.

Do I need 5D BIM?

The Indian government has made a significant investment to grow the AECO industry, this along with the development of many mega-structures such as the metro train project has increased focus on the use of technologies including BIM.

The amount of detail needed for each project will vary, but it may be desirable to gain more information at this early stage to reduce construction costs but also remember that 5D BIM looks at the entire life of a project. This will factor in such changes as future greenhouse gas emissions, refurbishment and indeed life expectancy before demolition thus managing ongoing costs as well as initial build. This is potentially crucial for the future of the construction industry in India, being able to construct a building at low cost is desirable but delivering a higher quality construction with a longer lifespan and lower ongoing running costs is highly desirable.

What is the potential saving of using a BIM agency?

While cost will vary from company to company, we can assess the impact both on initial costs of construction and over the lifetime of the building by comparing possible savings.

Having an efficient design produced by a BIM agency could reduce conflict and reworking during construction by up to 55% and improve the quality of the finished structure by 50% leading to higher levels of customer satisfaction and giving an extremely desirable reduction of up to 20% in construction cost.  Use of BIM can also improve structural performance by up to 35% meaning the lifespan of the buildings will be longer. If we compare savings over time including operational costs with construction costs a 33% reduction of the total anticipated spend is possible.

Using these figures, our previous construction example with an anticipated spend for construction of $200,000, would potentially reduce to $160,000, giving a massive saving of $40,000 in initial costs.

[This is a general example and exact savings would be the result of numerous factors].

Conclusion

Each project needs a careful cost analysis to compare the cost and savings of various factors. The use of BIM technology and hiring a BIM agency in india to do this is certainly an important one to consider as the potential benefits of avoiding delays and reworking to construction will definitely lead to savings. India has a growing construction need which will drive down the cost of BIM agencies and increase the savings for developers.

 

How Upcoming Infrastructure Projects can Revolutionalize BIM in India?

How Upcoming Infrastructure Projects can Revolutionalize BIM in India?

BIM is not a new and unknown term in India anymore.

Introduction

In recent years, Building Information Modeling, otherwise known as BIM, has grown in popularity with professionals in architecture, engineering, and construction industry. This is mainly due in part to the efficient tools it gives AEC professionals in the planning, designing, construction, and overall management phases of buildings and infrastructures. However, in India, the implementation of BIM modeling and applications has been slow and gradual in many industries.

India’s slow rise in BIM

BIM has unequivocally become a necessity for construction in almost every developed and developing country including India. So why has the process taken long to adopt? Generally, India has been a bit hesitant to adopt new technologies, and BIM expertise in india are limited in the region. Not to mention the heavy initial cost of BIM and the lack of involvement from the government of india to quicken its implementation. However, rapid urbanization and industrialization has changed the scenario and has given rise to the need for better infrastructural set ups in india. As it is said that the quality of the country’s existing infrastructure is neither efficient nor environmentally optimal. Which means there is a need for BIM technology to revolutionize the construction landscape in India.

 Construction Companies Using BIM

As mentioned earlier, AEC professionals have incorporated BIM into their projects, and this includes some of the biggest construction companies across the globe like Hochtief, China Communications Construction Group, Vinci, and Samsung C&T. Among them is also Indian based company Larsen & Toubro. L&T is a company that claims to have mastered BIM from the start. Beginning with a conceptual demonstration to detail architecture, all the way up to post construction, among other performance-enhancing applications. This extends to their projects including airports, IT infrastructure buildings, public buildings such as sport infrastructure and metro stations, and factories using steel, reinforced concrete, and pre-stressed concrete. The adoption of BIM processes has allowed experts to explore a project’s crucial characteristics physically and digitally even before it’s been completely built.

So how does L&T incorporate BIM into their projects and can more Indian based construction companies follow? These are six key factors in L&T’s BIM incorporation of software and technology:

Turnkey Capability

To ensure a project can even begin, it is vital to establish the human need for it combined with the efficient use of space. L&T offers turnkey design and construction of infrastructure and modern amenitiesthat meet customer needs. This eliminates the possibility of having a project fail before it can reach stakeholders.

Construction Techniques

Using advanced production techniques and high-speed technologies like heated tunnel forms and aluminum form work help in the reinforcement of walls and floor slabs on a continuous single pour which thereby reduces time and cost. Buildings are less acceptable to collapse which reduces the need for rebuilding.

Avant-Garde Technology

L&T has India’s largest fleet of construction equipment that offers speed, high quality, and cost-effective construction. With a combination of construction techniques and a systematic schedule, L&T is able to ensure quick work progress at high levels of accuracy and enhanced productivity with safe practices. Buildings are built with accuracy and speed which reduces the cost and time to finish.

Design and Build

L&T’s concept is simple: The General Contractor takes single-point-responsibility. To elaborate, the General Contractor is responsible for coordinating with the other AEC professionals involved in the project, including MEP consultants and promoters. The General Contractor is able to collaborate and communicate with the other team members through BIM software as they work together, saving time and avoiding confusion with the software’s cloud feature.

Precast Technology

This technology ensures improved quality and stability within its environment. It offers precast engineering like a precast feasibility study, precast structural concepts, and architectural coordination, and recast element detail design for stripping and transportation, among other things. A detailed precast is able to show the feasibility of a project before its completion including its stability and design which is cost effective. This includes the possibility of unforeseen circumstances such as natural disasters or construction hazards.

Finishes Implementation Centre (FIC)

A team of professionals set benchmarks for project deliverables without compromising on the quality of final seen finishes. L&T’s construction engineers transform the architect’s designs and drawings to reality. Projects are delivered to end users as a product built to structural rigidity. Visualization and simulation including the use of 3-D models help assure clients of their finished project and allow for accuracy before a project is complete.

Benefits of using BIM

As evident by L&T, there are many benefits to using BIM technology. Among them are cost, time, management, visualization, and maintaining control of possible unforeseen circumstances. BIM software ensures collaboration with all teams and helps eliminate the need for having to do reworks which is both cost-effective and time-saving.

The Future of BIM in India’s Industry

With its many benefits, India is quickly realizing that BIM modeling is vital for AEC professionals to be able to work together to design and develop buildings. However, despite the known benefits, there are still barriers that prevent India from fully engaging in BIM implementation. These include cost of equipment, client driven limitations, lack of education and training, legal and commercial barriers. The good news is that progress is being made. There are now more than 50 AECO organizations that deliver BIM projects to the local and global market. More buildings and infrastructure are being built in India using BIM software and technology including metro stations and housing facilities. Free seminars are being held in Dubai at Construction Expos to specifically inform AEC professionals about the many benefits of BIM and how to utilize the model. This is a big step for the AECO industry, which is the second largest industry in India, employing more than 35 million as of 2015.

Conclusion

Countries, whether developed or developing, are seeing the long-lasting value in BIM technology. Though there is still progress that needs to be made and barriers that need to be lifted, with its adoption, future indications are promising for BIM technology in India’s Construction Industry.

 

 

 

 

 

 

 

 

 

 

 

 

Why Should Building Information Modeling (BIM) Start from the Early Stages?

Why Should Building Information Modeling (BIM) Start from the Early Stages?

Why Should Building Information Modeling (BIM) Start from the Early Stages ?

So, what is BIM or Building Information Modeling?

The definition of Building Information Modeling or Building Information Model(BIM); describes the process of designing a building on a collaborative level. Thus, using one system of computer models, coherently bringing the design together; rather than many separate sets of drawings. Moreover, a digital representation of the functional and physical characteristics of a facility. It is a resource of shared knowledge or information regarding a facility. This information can be essential to making responsible decisions regarding a facility way to early than from the traditional CAD drawings. Not just from the conception of the building, but during the facilities life cycle too. It is a plan from the conceptualization of the structure to demolition. In short, it is a piece of software(s) that designs the building, from birth to death.

Understanding (BIM) Modeling, helps us see its potential impact.  Now, that we understand the definition of Building Information Modeling (BIM) software, let’s look at a few of the advantages BIM software offer.

  • Easy visualization of your construction project in a 3D environment.
  • Less rework on design changes thereby acting as money saver and time saver,
  • Improved collaboration between consultants reducing on-site coordination issues early,
  • Various simulations can be performed such as construction sequencing and construction cost providing transparency among shareholders

It is easy to see why starting with BIM or Building Information Modeling in the earliest stages of a construction would be the smart move. BIM allows the stakeholders to bring their construction projects to fruition more seamlessly, and with fewer surprises. Traditionally designing buildings relied mostly on two-dimensional technical drawings. (e.g., sections, elevations, and plans to name a few), recently, the shift to BIM has created more value.

3D (height, width, and depth), and beyond!

With the development of computer programs from old days, there was a considerable innovation of being able to create your buildings in 3D and the old drawing table and tools of the trade of architecture. Drafting on the paper in the digital was only the start. Building Information Modeling(BIM) extends the scope of what the older programs did. Also, taking it the ways beyond 3D as technology kept changing and is changing.

Building information modeling, 3D design software, with a twist.

Not only you have the 3D capabilities as you had in the older and more traditional CAD software, BIM brings time as the fourth dimension, cost as the fifth dimension and has a much broader scope and meaning than just geometry. It carries the manufacturer information for the properties and quantities of building components, and materials used in the completion of the building. BIM is capable of projecting completion time as and when necessary repairs to the structure might expect. From Construction Documentation to Maintenance, everyone working on the project is on the same page and they have access to, and can enter data into the BIM, which is essential to a seamless outcome.

(BIM) modeling services can build from the ground up.

The BIM modeling program or services first starts from the ground underneath the structure. The project begins with the images of the earth, digital elevation, and aerial imagery, along with laser scans of the existing site. BIM is capable of capturing real-time information in regard with the project location. BIM Designers benefit from all the input compiled and shared in a way paper was never able to do.

Imagine you need to make changes to your project, now what?

There was a time when, if there were changes in a plan (e.g., number of size of windows) for some reason, an entirely new drawing had to be redraw to account for the differences. Maybe just to add a staircase or another exit. Now, while using BIM, you make the changes, hit save, and the whole team has access to the new information in real time using cloud technology. Instead of heading back to the drawing table, and starting again, adding and taking elements away has become a thing of ease now. Think of the money saved by an action to just save the project, thus helping everyone to stay on the same page while working on the construction project; this is one of the more luxurious aspects of Building information modeling. It will also link construction cost and installation costs for the newly added attributes to the building. Thus, saving time and significantly reducing the overall cost of the building project.

Building Information Modeling(BIM) programs and the environment.

BIM modeling can also take the overall operational costs of the finished product in mind. It also has multiple simulation options available so that the design staff can observe the building attributes in all seasons. Its features such as this that can assist in building smarter, more economical, and energy efficient structures. With the click of a button, all the analyses can be done to achieve peak performance. Building Information Modeling(BIM) programs can also detect potentially costly errors on the construction site and can inform about its occurrence such as on-site coordination issues. Things such as electrical conduits or ducts that runs into beams on site; this on-site issue can be expensive, and can be effectively bypassed with BIM modeling. The problem will be detected before you break ground to construction. BIM has the ability to fix such issues, such as these on-site coordination issues, that often plague projects when run by multiple teams. Here again, BIM is a money saver for construction projects. Also, BIM is an excellent way for the transfer of knowledge by sharing traditional plans, sections, elevations, as well as other types of reports that the teams can share with other parts of the project team. The software has customizable features and automation tools such as annotating a category of elements at once, saves precious drafting time; thus, conserving the project money and construction pitfalls.

BIM modeling software helps sequence the steps in a building plan.

BIM modeling software can sequence the steps of building the structure and all phases of these steps, down to the materials needed to accomplish the next step in the series of construction. The sequencing of steps is completed with animations and simulations, helping to coordinate the construction processes. Hence, delivering a more predictable outcome of the project beneficial for stakeholders. These are just some of the reasons that if a BIM plan is in place and is wisely used in the earlier on in the project, the better or smoother the project progresses. Making projects more seamless while saving valuable time and money on any project from a home to a high-rise building.

What is Building Information Modeling? BIM Adoption in India

What is Building Information Modeling? BIM Adoption in India

Global BIM (Building Information Modeling) scenario

In the construction industry, traditional methods (2D) for design and construction is being rapidly moving towards 3D digital models: BIM. Developing intelligent 3D digital models and communicating project information with ease within the project team is the key within BIM.

The current BIM Adoption in India in building industry began by the similar approach as the decades-long usage of digital prototyping by the manufacturing industry for engineering, analysis, and production of products.

In today’s scenario, as the economies are rebounding at a snail pace, the building supply chain ranging from architects, engineers, contractors, and fabricators are expected to deliver projects faster and within smaller budgets. To gain the competitive edge, more and more firms are adopting BIM which improves productivity and profit margins which have resulted in many BIM mandates across various countries.

Expectations are growing for closer collaboration of different disciplines within the project. Advancement in technologies for communication and cloud technologies has transformed how people work together.

Prefabrication has witnessed increased demand by improving construction productivity and BIM work-flow bridges design and construction by connecting designers with fabricators and contractors.

Economic construction with clear design intents has become the expected standard for building projects in today’s world. BIM work-flows and analysis tools help firms evaluating the cost-effective project delivery at every stage.

Therefore, rapid BIM adoption in India in the construction industry has clearly highlighted that the industry is moving away from the traditional 2D methods towards BIM for fast and cost-effective project delivery.

 

Can we still rely on decade-old 2D process and technology to survive?

Before answering this question, let’s closely look at what is BIM.

It’s the question the majority of us from the Architecture, and Construction background must know. BIM is a way to create the digital model of the building or infrastructure before its actual construction. Note that the digital model must be intelligent enough to provide various information such as visualization, documentation, cost estimation, clashes, simulation, etc.

BIM tools such as Autodesk Revit works on integrated databases to maintain relationships between different model elements by connecting everything. Additional efforts are none to keep the project data in sync and manual labor is less.

Professionals practicing BIM has experienced reduced errors and omissions, reduced project duration, more profit, win new projects, repeat business, etc as short and long-term BIM benefits.

To survive in the upcoming times, firms must re-work on their strategies by adding the use of BIM. One cannot sit back and wait for the increased BIM Adoption in India in their business markets. They need to be at the forefront of using BIM.

 

Looking for best Revit trainers in Delhi-NCR then contact us at contact@bimncad.com

What is Scan to BIM Services or Point Cloud to BIM ?

What is Scan to BIM Services or Point Cloud to BIM ?

Building Information Modelling (BIM) has become one of the most promising developments in the architecture, engineering, and construction (AEC) industries, and fundamentally it is changing the way the construction industry works. In recent years, the industry has shifted from traditional two-dimensional drawings, drafts, and designs to 3D visualizations. And worldwide has adopted the BIM concepts and technologies of Building Information Modelling and there is an upward demand for the digitalization of the existing building stock.

“Scan to BIM Services (popularly known as Point Cloud to BIM) referred to the process of 3D laser scanning a physical space or site, to create an accurate digital point cloud of the structure and using scans BEM software, bridge the gap between a separate digital point cloud and one that can be used inside the Autodesk Revit platform. That representation can then be used for designing, assessing progress or evaluation options.”

Scan to BIM is a technology that came as a breakthrough in the construction industries as it is accelerating rapidly as it provides a faster, captures dimensions, volume quickly, efficiently, a highly detailed and accurate structural profile for capturing survey data critical for refurbishment or retro-fitting existing projects.

Point clouds resulting from scan data are massively powerful for analysis on their own. Converting scan data into BIM models is customarily a three-step process: First, from different scanning stations, multiple scans are captured from. Second, data from multiple scanning stations is stitched together in what is commonly known as the post-processing or registration stage. Next, CAD or BIM software can be used to author object models while referencing the point cloud.

It is clear that Scan to BIM is the future of AEC industry and produces high definition scanning has practical, time (faster than 2D drawings) and cost-saving applications especially at the initial stages of repositioning projects and increase the accuracy of project information.

Author: Anisha Khatun